Monday, June 04, 2007

Silver Spring's 1200 East-West Highway Project Starts Work


For those living in Silver Spring in the Silverton or Mica, I would suggest investing in earplugs for the next year. In late May, dcmud reported that preparation work was being started on 1200 Blair Mill (the small 0.77-acre triangular lot where Blair Mill, Newell Street, and East-West Highway meet ), a $37 million, 99-118 unit condominium project by MR Associates, LLC (Perseus Realty, LLC). And now, as confirmed by our daily walk past this corner on the way for coffee, demolition work has kicked into gear on the site of 1200 East-West Highway (at the southwest corner of East-West and Blair Mill), with the existing auto repair shop on the property now meeting the wrecking crane. Originally a twinkle in the eye of Centex Cityhomes, 1200 East-West was shelved by that company last October. However, the project and plans were bought by Home Properties, with the only change now being apartments replacing the planned condos. When completed in 2009, 1200 East-West will contain a 14-story, mixed-use building, including 247 rental units (ranging in size from 715 to 1365 sf) and approximately 10,600 sf of retail space on the first floor, with over 200 below-ground parking spaces. These two projects, plus JBG and Turner Construction’s imposing 460-unit Silver Spring Gateway project just across East-West Highway, will ensure another year of orange cones, cranes, and dust for this tiny corner of town.

Previously: Signs of Life at Silver Spring’s 1200 Blair Mill Project?

0 comments:

Post a Comment

Commercial ads will be deleted, so don't even think about it.

 

DCmud - The Urban Real Estate Digest of Washington DC Copyright © 2008 Black Brown Pop Template by Ipiet's Blogger Template