Showing posts with label Sigal Construction. Show all posts
Showing posts with label Sigal Construction. Show all posts

Friday, October 22, 2010

Hickok Cole to Design New AIA Center in DC

6 comments

The Washington D.C. Chapter of the American Institute of Architects (AIA|DC), in partnership with the Washington Architectural Foundation (WAF), recently revealed that a team from Hickok Cole Architects has been awarded the task of designing the new District Architecture Center (DAC) at 421 7th Street NW in downtown Washington, D.C. AIA received 17 contest entries from firms throughout the District, but the six-person jury could only select one winning design. Winning the week-long, rapid-fire design competition doesn't just earn the architects an ego boost, they also get the design contract and a $6,500 prize. Coming in second place, and sure to be heckled at the office, was another team from Hickok Cole; but losing doesn't taste quite as bad with a $3,500 check.

Members of the winning team include: Devon Perkins, AIA LEED AP; Jason Wright, AIA LEED AP; Lori Geftic, IIDA, LEED AP; Matt Starr, Assoc. AIA; Rod Letonja, AIA, LEED AP; Shelly Mrstik, RA, LEED AP, and Thomas Corrado, LEED AP. The working drawings were spawned from "a conviction that the project should express light, transparency and a connection with the city." More specifically, the design team penciled a two-story space that employs a healthy dose of glass so that a sense of openness, as well as natural light (sunlight, not the beer), spills throughout the entire building. When reached for comment on their winning design, the media staff at Hickok Cole played Steel-Curtain-style defense, sternly denying DCMud's prying questions: "we cannot release any more information than has already been put out there." What kind of dirty secrets could be hiding behind an innocent design competition? That's the kind of perilous journalistic digging that should be left to Bisnow; let's just hope this blog is not in too deep already.

Sigal Construction has agreed to act as general contractor, and construction is expected to begin in March of 2011, putting an optimistic delivery and move-in date in the late summer of next year. Initial sketches must be elaborated and expanded upon, as finalized architectural drawings are to be completed by the end of December to avoid delays. Besides anchoring educational outreach efforts and operating as the Chapter House for AIA|DC and for WAF, the Center plans to also feature a gallery dedicated to showcasing architecture and design talent from around the capital city.

Washington, D.C. Real Estate Development News
 

DCmud - The Urban Real Estate Digest of Washington DC Copyright © 2008 Black Brown Pop Template by Ipiet's Blogger Template