Showing posts with label Creaser O'Brien Architects. Show all posts
Showing posts with label Creaser O'Brien Architects. Show all posts
Thursday, July 23, 2009
How to Hide a Six-Story Office Building in Dupont
0
comments
Posted by
Shaun on 7/23/2009 05:26:00 PM
Labels: Creaser O'Brien Architects, Dupont Circle
Labels: Creaser O'Brien Architects, Dupont Circle
Is it possible to hide a six-story office building on an historic street in Dupont? Two Queen Anne style rowhomes in Dupont are one step closer to having a six-story structure built behind them. Today the Historic Preservation Review Board (HPRB) consented to plans presented by Creaser O'Brien Architects with the caveat that the building must not be visible when standing in front of a building across the street. If something goes wrong - HPRB will demand a top floor hair cut. Eek.
The two Dupont rowhomes, 1820 and 1822 Jefferson Place NW, have long been in use as office space and are currently connected internally. The planned addition is designed to appear as a unique structure behind the two existing structures. Among the concerns raised in the HPRB staff report was the 26 feet the new structure will rise above the roofs of the original structures, the other is the proposed removal of the original brownstone stair in favor of a retractable stair with a lift in order to provide accessibility.
First, the height issue. The HPRB has a standard by which additions are allowed in historic structures if the structure is subordinate to the original structure or, in some urban areas, if the structure is separate from or behind the existing structure and can be hidden from view. One such exception was granted on the same street in 2005, and the staff report applied these same standards to the proposed project at 1820-1822 Jefferson. The architects altered the planned height as measured from the curb from 67 feet to 65 feet inches. The board passed the recommendation to adopt the staff report with the caveat that the architects do more to refine the design aspects of the planned new build, which was described as minimalist and too modest.
When the HPRB refers to an element slated for removal as a "character-defining feature," you've got problems. Proposed removal of the brownstone front stairs faced competing priorities of accessibility and historic preservation. Board members were unwilling to accept the proposed plan to remove the original stairs and decided to defer the decision until other accessible options could be found. Namely, the potential of having a lift at another location onsite that had been previously altered and therefore would not have a historic effect.
Finally, the board passed a plan to require the group to perform renovation work on the existing historic buildings, feeling this was a fair request given the "monumentality" of the proposed structure. Whoa, six-stories; NYC is rotfl at that one. Proposed renovations include installing a more historically accurate replacement door and providing more green space in the public area in front, in keeping with the appearance of the neighborhood.
Monday, May 18, 2009
Newfound Humanity in Arlington
4
comments
Posted by
Nope on 5/18/2009 08:57:00 AM
Labels: Arlington, condos, Creaser O'Brien Architects, Habitat for Humanity
Labels: Arlington, condos, Creaser O'Brien Architects, Habitat for Humanity
Habitat for Humanity of Northern Virginia will soon convert a 50-year-old Arlington apartment complex into low income housing, pending county approval. Known to area residents as the Perry S. Hall Apartments, Habitat will update the aging facility at 2912 17th Street South and then, in a move not usually associated with non-profit developer, put all 12 units of housing in complex up for sale as affordable-rate condos.
But neighbors shouldn’t fret over more low-income housing going up next door, says the developer. Since purchasing the property from Wesley Housing in 2005, the building has remained entirely vacant and George Lane, Project Manager for Habitat NOVA, tells DCmud the revitalized Hall Apartments will contribute to, not detract from, thank you very much, the surrounding Nauck neighborhood.
“[It’ll be] a major improvement to the neighborhood. If you drive by what’s there, it’s a pretty raggedy looking old building. No one’s done anything to it in 25 or 30 years and what we’re doing will blend in with the neighborhood. It’s colonial-style and it’s going to look very nice. There will be brick used in it…and a lot of nice window features. The units will be updated with modern appliances and plumbing and all that,” said Lane. “We’re building the same sort of housing [middle-class buyers] expect to live in today. We’re just building it for people who don’t make as much money.”
According to Lane, the development team – which also includes Creaser/O’Brien Architects – met with local Nauck residents last year to present designs and has stated the intention to ensure that locals already living in the area with be given “an equal, if not preferred opportunity” to purchase condo units. At present, they are scheduled to be available to those making between 20% and 60% AMI. Though Habitat famously relies on a stable of volunteers to construct their homes, the developer stresses the quality of the colonial-style apartment building will be on par with that of any professionally built project.
"Habitat uses a lot of volunteers for finishes. They’ll hang the drywall, they’ll install the insulation, they’ll do the carpentry and they’ll paint…All electrical, mechanical plumbing and things of that nature…are all done by professional contractors,” said Lane. “We sub-contract that out to other companies.”
Surprising to most will be the fact that this is not Habitat of Northern Virginia’s first foray into world of condominium development. They’re currently under construction on another, 9-unit development, entitled the Maple Ridge Condominiums, at 4150 Stevenson Street in Fairfax. Another Fairfax condo project, the 12-unit Westbrook Forest, was completed in 2007. And, following an upcoming Planning Board hearing, Habitat hopes to have the Perry S. Hall condos join them in short order.
“If all goes well [at the May 19th hearing]…then we’ll settle our building permit. Hopefully, the County will turn those plans around in a month or two and we’ll be able to start in mid to late summer,” said Lane. The project is scheduled to wrap up by the spring of 2010.
Subscribe to:
Posts (Atom)