Friday, December 04, 2009
The Policy, Kalorama
Labels: Kalorama, new apartments, UIP Development
UIP Property Management, Inc. presents The Policy, located in the heart of the Kalorama Triangle at the corner of 20th and Kalorama Streets, NW. The Policy is a fully renovated, depression era building built in 1929. The Policy features 62 light filled, spacious apartments including studios, 1br/1ba and 2br/2ba apartments. The Policy has the luxurious feel of a high-end hotel with its grand lobbies featuring custom mahogany mill work and intricately patterned marble floors. The apartment homes were each fully renovated with condominium level finishes, including granite counters and vanities, stainless appliances, individual combo washer/dryers, individual, central heating and air conditioning, new kitchen and bath tile, restored hardwood floors and many large closets. The building also includes a controlled access entry system with 24 hour video monitoring, a bike storage room featuring a bike ramp, and additional storage lockers available for rent. If you want to live in the heart of the city or if you are looking to upgrade, starting at $2,2000, call us today at 202-244-3811 or visit us at our website www.uippm.com.
Monday, August 24, 2009
Ashton at Judiciary Square
Ashton at Judiciary Square is the seductive intersection of Manhattan swank and DC power. Ashton, a contemporary upscale building, brings high-end rentals to downtown. A welcome new residential addition to Penn Quarter, the sleek 12-story glass building boasts 49 spacious apartments and a parking garage, with amenities to match: marbled foyer with inlaid tile, 24-hour concierge, nearly 10 foot ceilings, and a choice of interior styles. Ashton comes furnished or not, short-term (3 month) or long-term leases; panoramic skyline views are standard.
Top floor suites are luxury itself: 3 bedrooms, 2 baths, 2700 s.f., and views from far southeast to Rosslyn and everything in between. Beyond lush apartments, life at Ashton means a gourmet catering kitchen, hotel-style guest suites and an HDTV lounge for residents. Walking distance to Judiciary Square Metro and easy entry to I-395, the Ashton offers VIP access to DC and beyond.
Starting at $3,979, contact 877.289.3162 for information, or visit the Ashton website.
Monday, June 29, 2009
Ballpark: Build It and They Will Come, They Might Even Stay
Labels: Ballpark, Capitol Riverfront, EYA, jpi, new apartments, new condos, new homes, Southeast
Friday, June 26, 2009
The Monty Makes (Another) Go of It in Bethesda
Labels: Bethesda, MNCPPC, new apartments, retail, SK and I Architects, Woodmont Triangle
Sunday, June 21, 2009
Debonair Development Coming to Woodley Park
Labels: Ashbourne Developments, HPRB, Monarc Construction, new apartments, studio 27, Woodley Park
Wednesday, June 17, 2009
Founders Square Readies for Demo in Ballston
Labels: Arlington, Ballston, new apartments, Paradigm Development, retail, RTKL, Shooshan Company
Sunday, June 07, 2009
Industry Insight: Steve Schwat of Urban Investment Partners
Labels: interview, new apartments, new condos, renovation, UIP Development
As the area condo market began its steep descent a few years back, UIP turned its focus to a practice Schwat calls the "value add" - a program that provides "substantial rehabilitation" to blighted or vacant buildings with updated amenities and streamlined utility systems. Schwat spoke with DCmud about UIP's expanding list of services and the state of DC development in general from their newly acquired Connecticut Avenue offices, directly beneath one such "value add" property currently under renovation: the historic Macklin apartment complex at 2911 Newark Street, NW.
Can you tell us a bit about how UIP came together and the work you do here at the firm?
I’m one of the original principals. There are three of us. We started back around 2000 and I have been in Washington since 1980, when I went to school at GW. I’m serial entrepreneur of sorts. I’ve owned a number of different businesses and I have a background in sales. My initial interest in real estate was doing single-family homes, and then I did my first condominium project in the early 80s, by renovating an older historic-type building. I sort of caught the renovation bug.
I enjoy starting companies, administrating companies and getting them running. What been as a hobby in real estate turned into a full blown career. My two partners, both of whom are Dutch, have been in real estate for a very long time. There was a combination of their deep experience in real estate investing and my knowledge of Washington and ability to create a functioning operation.
UIP doesn’t only operate as developer, but offers general contracting and property management services as well. Can you profile the organization for us?
UIP was always the rental group and all of our rental properties are owned under some kind of UIP entity. Drummond Development was our for-sale company and, if we do a for-sale project, it’s done under Drummond – just to keep the different types of investment separate. Then we have Urban CM, which is our construction group, and we currently do our own construction on projects up to $5 million. That may expand sometime in the next year or so if we do bigger projects.
Our property management group started in January of this year. We hired Dave Barton, who was running Randall Hagman’s residential management group, and when he resigned, they sort of sent him off with his staff and about 700 apartment units. So, we now manage our own properties. Before that, we were hiring third-party property managers…[but] we’d always envisioned having our own property management company, simply because we were constantly dissatisfied with the level of performance we got from other companies.
As it turned out, as the industry changes and the capital markets change and businesses are consolidating, we’d been considering it for so long that it didn’t seem like a consolidation move. In the end, in a market where you’re starting to worry about your ability to do as many deals this year as you did last year, it’s certainly a benefit to bring a fee-based entity in. You were giving away 5% before and now you’re bringing it in yourself. That’s not to say property management is highly profitable business. For us, it’s not yet, but it’s highly profitable for us as asset holders and asset managers.
How do you go about finding and selecting properties for rehabilitation? They all seem to be historic, yet something with an architectural history like the Macklin seems like a more obvious choice than say, 1921 Kalorama.
The prominent history, from an investment perspective, is probably fifth down on the list of the top five priorities. It’s certainly more fun to do architecturally significant buildings than it is to do historically insignificant buildings...What we look for in a property if we’re going to do a "value add" is “Can we increase the rents? Can we decrease the expenses? Does the building need the improvements that we’re talking about? And is there a method within DC rent control that’s going to allow us to achieve those goals?”
That’s really the key when you’re marketing inside a rent controlled environment like the District of Columbia. It’s not a matter of looking for loopholes; it’s a matter of utilizing the system in a legal way, taking buildings that are in need of substantial rehabilitation, putting it all together, and, in the end, doing what is a justified renovation of the building.
But, in that, you have two things that directly conflict. One is the city’s desire to maintain affordable housing. [The second is that] if you’re going to pour a million dollars into a building to renovate it, that’s something that will cause you to increase, not decrease the rent. Dig one level deeper and that conflict becomes a reality where you have people living in grandfathered buildings with antiquated heating, cooling, and electrical systems…If you were to build that building today, it would never meet code. But because it’s been grandfathered in over so many years, it technically gets past the code. But that doesn’t mean it’s safe or that the electrical system doesn’t need to be replaced.
Within rent control, there are a number of tools you can use to increase rents. But you can’t just take a crapped out building and increase the rent because it’s still crapped out. You can’t take a building that you wouldn’t live in…and just raise the rents because that’s not very moral. So there’s a balance of working within the rent control environment and achieving that perfect storm of, “Is the property currently requiring improvement? Is the property currently renting below market rate? Is there a tool within a rent control that we can use to increase the rents while working with the Office of the Tenant Advocate and the Rent Administrator?...[That is] separate from my political opinions on what preserving and providing affordable housing should be. That is not to say that I agree 100% with the District, but there is the law and you have operate within it.
That said, some of the District’s rent control laws are antiquated and somewhat backwards in their thinking. The concept of maintaining affordable units in an otherwise upscale building has some inherent issues that are problematic...If you build $700,000 houses or condominiums, is it appropriate to have a $200,000 condominium in that building? Issues like amenities and monthly maintenance fees are also in direct conflict with one another.
Does UIP view new construction as profitable arm of the business? Or is the company content with sticking to renovations culled from DC’s vast inventory of vacant buildings?
Well, a vacant building is what we see as a “value add” building. So, yea, we’re all over that. And, yes, potentially for condominium sales, I think the market – although it dropped off precipitously at some point after 2005 and has remained low – still has absorption in DC. There are still people looking to buy condominiums. For instance, The Shelby at 1706 T Street or The Macklin at 2911 Newark Street, both have condominium registrations associated with them, so they could be sold as a condo at some point in the future. But that’s not our plan or the way we underwrote them. We underwrote them as rental properties and we renovated them as rental properties.
Ironically, coincidentally, fortuitously, though, a renovation of a rental property…is very similar to the renovation you do for a condominium because you have to self-contain utilities and make it simple, so that someone can own it. There’s a lot of synergy there in renovating a building for rental, where you’re reducing your expenses. Part of our whole “value add” strategy is not only increasing the rents, but also decreasing your expenses from five, six grand per unit per year to something less than three grand because you’re not heating the building with a highly inefficient furnace that burns all day long…as opposed to replacing it with a self-contained unit that the tenant is responsible for. It’s amazing how green a technology that is…If leave, I turn it off; I come home, I turn it on.
The definition of “value add” is in how you exit and, if there’s one thing I’d like to say, it’s that “It’s the exit, stupid”…I like to talk about my condominium experience because we did a lot of “value add” renovations with condos. People go, “Oh no, condos,” but the sale of a condominium and the sale of an apartment building is the same thing. It’s just a contract selling one on a wholesale basis and another selling condominiums on a retail basis. A condominium unit is generally worth more than a rental unit, but, the point, is it’s a really a matter of what the equity wants and what the market is saying.
We have a friendly competitor that recently completed a condominium building on Vernon Street and they’re having a really high velocity of sales. We just finished an apartment rental two blocks from there and we rented out all our units in less than a month. There are strong market indications for both. We thought we’d start to see the rental ceiling – what’s the highest we can rent these units for – and we haven’t seen it…With the inventory higher now than it was two years ago, people have a choice. If you’re building something in a bad neighborhood or an undeveloped neighborhood or uncharted territory, I think you’re going to have problems. The only time you didn’t have problems was when supply and demand were so imbalanced that people were writing contracts just based on paper plans…We’re certainly a lot closer to reality today than we were three years ago. Three years ago, it was more important what the appetizers at the opening party were than how people wrote contracts.
With a well located property, you can sell condominiums today. We’re just over the last few months, after two years of not even mentioning the word condominium, I actually had a meeting with an equity partner who said, “We’re not afraid of condos. If you show that you think it’ll work, we’ll do condos.” And I think the market is saying just that.
Does that mean we’ll being seeing more from-scratch, new development from UIP in the future?
We’re just starting to look at ground-up construction. We’re starting to look at developable property that we stopped looking at for a year or so - some as rental, some as condo. For a while, you couldn’t buy developable land for a price that you could rent at. Seller anticipations are starting to come into line with buyer expectations. There was that time when if you had a vacant building for sale, it was a hundred grand a year because it was assumed you’d do a condo and sell it out at three hundred grand a year…Now you got the guys that bought the buildings for a hundred, paid a little more money to get rid of the last two or three tenants…carried it for a year and they now have a vacant building – with a big fat tax bill, a nasty interest carry cost each month and nobody that is willing to finance a condominium.
Ok, so go rental? But if you’re on 10th Street, NW, an area that’s not supporting $2000 or $3000 a month rentals, how are you going take a hundred grand a unit, spend another seventy grand to renovate it and then rent it for $1200 a month? You’re losing money, so no one’s going to finance that.
There’s a lot of that type of property out there and that’s the type of property that we’ve been looking a lot at lately. There a lot of distressed owners – I won’t call them sellers yet – and they’re trying to figure out how to get out.
Given the tumultuous state people like that have found themselves in, what advice would you give to fellow DC area developers?
I’d go back to the basics and say that the money is in the buy. You can’t underpay for a property, you can only overpay. And once you’ve overpaid for that property, only time will help you erase that. So you have to buy property…and look at it on an income producing basis. The question is, “Can I buy it, fix it up and rent, while staying cash positive?” If you can’t, nobody’s going to finance it. And if no one’s going to finance it, why would you invest a million dollars of your own money to generate fifty grand a year in income? There are plenty of alternative places to put that money.
Where do have to be these days? DC is faring a lot a better than other areas these days, but investors don’t want to invest in DC real estate unless...you can assure them going in. I don’t see much stuff being sold for less than seven (cap rate). Maybe some AAA, pension quality development, like Mass Court, will go…but there’s not a lot of that kind of product out there. But if you’re talking about the kind of stuff that we buy – 20, 30, 40-unit buildings and small retail stuff – you’d better be at an eight cap.
[Look at] the 14th Street corridor or U Street or Adams Morgan. Christ, look at 18th Street and the vacancy right here in Cleveland Park. You’d better have a pretty good deal – a good buy, a good tenant and reasonable cap rate – if you’re getting into a small retail or small apartment building. And the interesting thing is that’s what we like to do. We like to find that opportunity.
With that in mind, what’s next for UIP in over the course of the coming year?
I see us moving forward with a very aggressive and very prolific acquisition strategy. Last year, we acquired some $60 odd million worth of real estate and bought five buildings with our equity partners. This year, we’ll be closing on two properties over the next couple weeks. We sold one or two earlier this year, which was opportunistic and advantageous…I see us making between half a dozen and dozen acquisitions over the next six to eight months.
I’ve got a stack of potential properties. We’ve got a couple deals that are small retail, a couple deals that are small residential, we have a couple big, multi-hundred unit deals and a couple that are potential bank deals. And they’re all in DC. We own property in PG County – Hyattsville, Riverdale – and we are good at managing those garden-style walk-ups as well. We own a bunch of that and we’re looking a lot of it too, but I’d say that’s probably 20% of what we do. The 80% of what we look at is DC, from Southeast to Northwest, and distressed owner deals, bank deals, failed condo associations, failed tenant associations and failed development plans. We’re looking at a lot of that.
We’re looking at some properties that are owned by non-District headquartered companies. There are a lot of larger commercial real estate companies that got into the District and are now trying to get out. They hate the District, they hate rent control, they hate TOPA. We don’t love rent control either, but we’re damn good at it and we’ve been doing it for ten years.
Monday, June 01, 2009
Arlington’s First LEED Gold Apartments Get a Name (and a Game Plan)
Labels: Arlington, Courthouse, Erkiletian, LEED, Lessard Group, new apartments
The Tellus will use storm water retention for on-site irrigation, obtain a portion of its power from a green source grid, and incorporate on-site solar. A beautifully landscaped outdoor plaza using native, drought-resistant plants will replace an old impervious parking garage. Bicycle and smart car options will be available to residents. Additional green building elements include low-flow plumbing fixtures and modern recycling systems. Plans also include a $75,000 public art project in partnership with Arlington Parks, Recreation & Cultural Resources.
The Lessard Group designed the building that will replace the Arlington Courthouse’s aging Executive Office Building at 2009 14th Street North and include 254 rental residential units, 8,127 square feet of office space, first floor retail and an additional 2,257 square feet of "flex" space. A further selling point is the Tellus’ planned 26,000 square foot park that, from its perch atop a neighboring three-story parking garage, claims to offer views of downtown DC in all of its monumental gridlocked glory.
The current office complex on site, however, still stands and a date for demolition has yet to be decided. Though originally set for a third quarter 2009 start, ERES Development Manager, Bill Denton, says merely, “Construction plans are coming together well.”
Thursday, May 21, 2009
Southeast Seniors Get New Housing
Labels: Anacostia, BZA, new apartments, Southeast, Ward 8
"[My] history is that I’ve been a registered nurse for over the last past 30 years, and I have a history in working with pediatrics and elderly care," Frost-Labule told the DC Board of Zoning Adjustment in January 2007, shortly before receiving approval for the project. “I entered a RFP to provide housing for persons with disabilities in 2002, and during that time, I had several conversations with Department of Health, Department of Aging, and the Housing Authority, and they all were supportive of the project, stating that there was a great need for assistance with the elderly in the Southeast area…[That’s] when I bought the property.”
Designed by EDG Architects of Bethesda, the $3 million project is being funded through a combination of private loans, four housing trust funds and tax credits. Beyond providing merely new residences for area residents ages sixty and up, the development will also offer residents a wellness center to “provide services for individuals that might have chronic illnesses,” a multipurpose room and a shuttle service to provide “access to Metro, to shopping, to social, cultural events, as well as medical appointments.”
Once completed, the Bowen development will count the Howard Hill Apartments, Oxford Manor Apartments and another vacant parcel set aside for a future Hope VI housing project among its new neighbors. Hamel Builders will oversee construction when it begins later this year and will be accepting sub-contractor bids until 5 PM on June 9th.
DHCD Seeks Developers for Vacant DC Properties
Labels: Affordable Housing, DHCD, new apartments, renovation, rfp, Southeast
"For some [of these properties], this isn’t their first showing. This isn’t the first time they’ve been out there. We’ve been looking for opportunities to…convert them into affordable housing…We’re stepping up our efforts to re-introduce these properties, so they don’t just sit and cost the city money to maintain,” said DHCD spokesman Angelita Colon-Francia, who also detailed for DCmud just how and why these six sites were selected from the District’s hundreds-strong catalogue of vacant properties.
“Some were eminent domain, some were tax foreclosures, some were inter-agency transfer of property, but, basically, these are properties that have been in our inventory for a long time…What we’re trying to do is to get them back into use and generate affordable and workforce housing out of them,” she said.
Prospective developers are welcome to bid on as many, or as few, properties as they see fit. The scope and size of the various revitalization efforts, however, will depend on area zoning statutes, as some sites are designated for single-family use, while others are zoned for multi-family development. The wide variety of locales and regulations governing the various sites hasn’t allowed DHCD to predict exactly how much housing will be generated after the projects are awarded – but nonetheless, they’re adhering to strict set of guidelines that makes a clear distinction between which will sites will be required to host affordable and/or workforce units.
“The bottom line is that all of them have a requirement that all buildings have 30% of the units identified as affordable at 60% or less of the Area Median Income (AMI),” said Colon. “There are two exceptions to that: the New Jersey Avenue property and the one on French Street. For those, we’re looking more at workforce. They’ll have to be at or below 120% AMI.”
As of Tuesday, 11 potential bidders have taken up DHCD on their solicitation and Colon encourages developers and non-profits “with the capacity and qualifications” to apply. To that effect, DHCD will be holding a pre-bid conference on June 8th to “fill in the blanks.” The meeting will begin at 2 PM at DHCD headquarters at 1800 Martin Luther King, Jr. Boulevard, SE.
In the meantime, the solicitation is available in hard copy format only and can be picked up at the DHCD offices. Final proposals are due to agency by 3 PM on June 24th. Colon-Francia says the selection process timeline will be contingent on the number of responses received.
Tuesday, May 05, 2009
Georgia Commons Starts Up in Petworth
Labels: Fenty, Georgia Avenue, jair lynch, new apartments, Petworth
"It’s generally for families of four making 50, 60, 70 thousand dollars – that’s the market we’re talking about. It’s much different than the general impression of what people think low-income means," said developer Jair Lynch. "We think the remainder may be higher in the 80 to 90 thousand range. It’s not a drastic change.”
Whether it was the 18 lawsuits that the Deputy Mayor’s office worked diligently on for a year and a half, whether it was getting the permits out of [the Department of Consumer and Regulatory Affairs] with Councilmember Bowser, whether it was the mandatory exclusionary zoning that we anticipated coming, whether it was the collapse of the financial systems for the last six months, this project has persevered time and time again. We’re not quite there yet, but we hope in the next month, now that [the Housing Finance Agency] has their board members, [the Department of Housing and Community Development] is committed and the rest of our partners are here…we’ll start be able to this wonderful new project.
Monday, May 04, 2009
Live/Work for Alexandria's Main Drag
Wednesday, April 29, 2009
FDA Office Gets Residential Revamp in Rockville
Labels: AvalonBay, new apartments, Rockville, SK and I Architects, Twinbrook
Developers AvalonBay Communities are nearing the end of two years plus of planning for the redevelopment of the US Food and Drug Administration offices at 12720 Twinbrook Parkway in Rockville. The 32-year-old, 50, 235 square foot "office/flex industrial building" currently on site will soon be razed to make way for the Avalon at Twinbrook Station – a new, SK&I-designed residential complex that will add 240 units to the rental market.
"We've been presenting this plan to the neighborhood for the past two years and, essentially, now we’re [entering] the formal approval process. The City of Rockville was going through an entire…master plan recreation for Twinbrook neighborhood,” said John Cox, a Senior Vice President at AvalonBay, of the project’s origins. “When they created the new Twinbrook neighborhood plan, [the City] endorsed our use on the site.”
With the backing of both the local community and city planners, the development team will deliver more than two hundred apartments – ranging in size from 450 square foot studios to 1200 square foot two-bedroom "lofts" – with 12.5% set aside for affordable housing. The bulk of Twinbrook Station will top out at four-stories, but also include a portion that steps down to a three-story “townhome façade along the majority of Halpine Road.” It’s a design scheme that has allowed the developers to conceal the project’s parking garage by surrounding it with residential units on three sides – with the exception being a portion abutting the future site of 7-story office building currently in development by Uniwest Commercial Realty.
AvalonBay will soon be submitting their final site plan to the Rockville City Council for approval and is planning for construction to get underway late next summer. “I don’t believe there is a scheduled hearing date yet, but, obviously, we’ve had numerous meetings with [City Council] staff and public committees,” said Cox. “We’re thinking [we’ll start in] probably the third quarter of 2010.”
District Officials Decry Condos, Celebrate Affordable Housing in Columbia Heights
Labels: 14th Street, Affordable Housing, Columbia Heights, Hamel Builders, Jim Graham, Mayor Adrian Fenty, new apartments, renovation, Somerset Development
Tuesday, April 28, 2009
Arlington's First Green and Gold Building
Labels: Arlington, Courthouse, Erkiletian, LEED, Lessard Group, new apartments, retail
In a major coup for Erkiletian Real Estate Services' (ERES) mixed-use redevelopment of the Executive Office Building, the developer has gained both a density bonus and approval from Arlington County Board. The reason? In a first for Arlington, ERES is pursuing a LEED Gold certification for their new building - a "green" rating second only to Platinum (but who can afford that nowadays).
Located two blocks away from the Courthouse Metro at 2009 14th Street North, the aging seven-story office complex and adjoining parking garage on site will be razed in the coming months to make way for a sixteen-story titan of eco-friendly development. At present, plans prepared by the architects of the Lessard Group call for 254 rental residential units, 8,127 square feet of office space and 4,354 square feet of retail - plus, for good measure, an additional 2,257 square feet of flexible office/retail space. Couple that with a 26,145 square foot public plaza on top of the project’s three-story parking garage -which, according to the Board, will host "a scenic overlook offering views of national monuments in Washington, DC" - and Arlington legislators have reason to be pleased as punch.
“This building has it all – high-quality housing, ground-floor retail and office space and a public plaza that will offer great views of the national monuments,” said Board Chairman Barbara Favola via press release. “We get all this in a building that is built to a Gold LEED standard. This is the sort of project we want to see more of in Arlington.”
The caveat is that while developers can aim for green standards, there is no guarantee that, once built, the project will qualify as planned. A final determination will made by the US Green Building Council based on five criteria: sustainability, water efficiency, energy and atmosphere, materials and resources, and indoor environmental quality. There's no word yet on exactly what type of features Arlingtonians can look forward to bragging about once the building is completed. When DCmud last reported on the as-of-yet untitled project in December, ERES was projecting a third quarter 2009 start date for construction – shortly after they begin work another 200-unit residential building at 621 North Payne Street in neighboring Alexandria.
Alexandria real estate development news