Friday, August 19, 2011

New Retail Center South of Georgetown's Social Safeway, Coming Soon

8 comments
When the new Safeway at 1855 Wisconsin Avenue NW was constructed, the parking lots to the south, on Wisconsin Avenue, were left untouched, to be developed later. Later is now, as Safeway Inc. began work this week on the project, which also includes renovation of an existing building, south of the lots.

A retail center - known as Georgetown East Park Center - described as a "continuation of [Safeway's] overall Georgetown project," by Safeway spokesperson Craig Muckle, is now under construction, by Roche Constructors.

Superseding the parking lot will be a brick building (a nod to the look and feel of the Safeway) with three retail spots fronting Wisconsin Avenue. The building will be connected, by an archway over a driveway, to an existing brick building (at 1815 Wisconsin Ave) which will be revamped, and will retain two storefronts on Wisconsin.

Einstein Bros Bagels, now closed for construction, occupied the corner location of the monolithic brick building at 1815 Wisconsin Avenue, which once housed four retailers, but will soon house three.

Though the building's envelope will remain largely as is, the face on Wisconsin Ave will be split into two distinct architectural styles; additionally both styles will be unique from that of the new building to the north.

The project was designed by Torti Gallas and Partners, under the direction of lead architect Brian O'Looney, along with architect of record Rounds VanDuzer Architects; the same team was responsible for the Safeway next door, which delivered in May of 2010.

Rounds Van Douzer Architects, out of Falls Church, has also designed the Bethesda Safeway, coming in September.

In 2008, Safeway Inc. formed the subsidiary - Property Development Centers (PDC) - with the goal of developing grocery-anchored retail centers nationwide. Safeway Inc. also purchased the retail building at 1815 Wisconsin Ave in 2008, for $4.2 million.

KLNB Retail is responsible for the leasing of five new tenants for the retail center; Einstein Bros Bagels is set to return, but will likely settle into the new northern building, not its old corner spot.

Another, nearly identical brick building to the south of 1815, at 1803-1805 Wisconsin Avenue, NW - now occupied by Sherwin Williams Paint and Next Day Blinds - is not owned by Safeway, and will not be redeveloped.

Amendment to article, 8/22: In response to some confusion over what kind of retail will be offered at the center, a previously included mock-up layout has been replaced by one without the names of any potential retailers, as lease-ups on site have not been confirmed.

Washington D.C. real estate development news

Thursday, August 18, 2011

County Rolls Out Arlington Mill Next Wednesday

0 comments
Arlington will roll out the pomp next Wednesday for Arlington Mill, a community center on Arlington's Columbia Pike that will soon be followed by an affordable housing project. The county demolished the previous buildings last spring, and will likely start actual construction next month.

The community center portion of the project will cost an estimated $24 to 25 million and include a gym, learning center, public plaza and garage, crafted by architects at Davis Carter Scott. Residences on the north side developed by Arlington Partnership for Affordable Housing (APAH), and designed by Kishimoto Gordon Dalaya Architecture (KGD) are scheduled to begin construction in 2012 with a targeted completion date of late 2013. No general contractor has been selected yet.

Under Arlington's agreement with APAH, the county will build the garage for both the community center and the residential portion, and APAH will then reimburse the county for its expense. "We are hoping to close and break ground...sometime towards the end of Q2 2012" says David Perrow, Project Manager for Arlington Mill. The affordable housing provider will be waiting in the wings, starting work on housing when the county finishes construction.

Residences will include 121 "tax-credit units" that will be open to individual making 60% or less of area median income. In return for affordable housing, the state of Virginia has granted APAH a $2.13m tax credit per year for 10 years, a credit that can be marketed to a financial partner. "We can sell that on the equity market," says Perrow. Construction of the community center should complete by next summer.

Arlington, Virginia real estate development news

Historic Landmark Status Arises in Plan for Old Wonder Bread Building

2 comments
An adaptive reuse plan by Douglas Development for the old Wonder Bread building has recently encountered a new factor in the mix - potential Historic Landmark status. An application, signed by Douglas and the D.C. Preservation League, was filed with the Historic Preservation Office on August 8th, requesting the Landmark status of the early-20th century industrial craftsman building.

The old Wonder Bread building at 641 S Street, NW in Shaw, is part of a seven-building industrial complex built between 1913 and 1936. The building was purchased by Continental Mills in 1936, and much more recently by Douglas Development (d.b.a. Jemal's Wonder LLC) in October of 1997.

As reported by the Washington City Paper, the 2- and 3-story, 60,000-s.f. building will be redeveloped as office space. Paul Millstein, in charge of Douglas' construction happenings, confirmed this fact, but acknowledges that there is uncertainty as to first-floor uses: "It could go retail or office, depending on the market."

Either way, the plan was always to retain the building's historic façade.

Millstein said, in July, that the redevelopment, designed by R2L:Architects' Sacha Rosen, will work around the building's well-known face on the block. Added density will be tucked into the back (not the top) of the building, which will push the building's envelope out towards the alley, and transform the structure into a "clean box shape" without significantly changing the building's appearance, said Millstein.

Rebecca Miller, executive director of the D.C. Preservation League, said the decision to submit the building to the HPO for Historic Landmark status was an easy one and has been in the works for the past year; the process was facilitated by the fact that Douglas' working concept has always included retention of the building's historic character.

As far as progress goes, Millstein reports that Douglas has not obtained construction permits yet, but, in July, he foresaw having the necessary paperwork in place by early September. Landmark Status review is not yet scheduled, although it could be as early as next month.

Expedited construction/repair permits were issued on the site in April, in order to ready the building for the D.C. Preservation League's 40th anniversary party, however the 90-year-old structure requires more than the last-minute nip-and-tuck (although impressive) that it underwent for the spring gala.

Of redeveloping the '20s-era structure, Millstein declared, “It’s a very cool building, a very cool project.”

The first Wonder Bread bakery in D.C. was located nearby at Georgia Avenue and Bryant Street NW, which was absorbed by the growing Howard University campus in the '90s. The Wonder Bread building being redeveloped at 7th and S Streets first housed the Bond Bakery, then the Dorsch's White Cross Bakery (responsible for the façade that now stands, with white crosses made out of tile), which was bought by Continental Mills.

Washington D.C. real estate development news

Wednesday, August 17, 2011

Northwest One's Site 2 on its Way Up

2 comments
In less than one month, according to the office of Victor Hoskins, the Deputy Mayor for Planning and Economic Development, construction will "officially" begin on another piece of the District's $700-million-dollar Northwest One New Community at 2 M Street, NE, known as "Site 2 (of Phase 1)", where a 12-story, 314-unit residential-and-retail building will go up.

With all permits in place, and pre-construction activity having begun on site last month, the official groundbreaking, by general contractor WCS Construction, is slated for September 12th.

Construction was initially expected to be underway in March, and when questioned about stalled District developments at a WDCAR event in mid-July, Hoskins pointed to NW1 as an example of an active site. "We are currently bringing the community to that location," said Hoskins, of the project's footprint around North Capitol Street in Ward 6, both in and west of NoMa.

NW1, approved by Council in 2005, began gearing up in 2008 and the new Walker-Jones School was the first completed component, followed by the first residential component, the SeVerna, which broke ground last summer.

According to Jose Sousa at DMPED, the "slowing of debt markets" was the cause of the delay, which affected both the development team, led by William C. Smith + Co. along with The Warrenton Group, and the District. The group, Sousa explained, "adapted by securing FHA mortgage insurance from HUD." Final confirmation and approval of the HUD transaction is imminent, said Sousa.

With construction expected to last 28 months, the 314-unit apartment building, designed by Eric Colbert & Associates, should be complete at the end of 2013.

Of the 314 units, 221 will be rented at market rate, 59 units will be set aside for former Temple Court residents (30% of AMI), and 34 units will be available for those making 60% of AMI.

There will be 4,100 s.f. of ground floor retail and an 8,000 s.f. courtyard above two levels of underground parking, offering between 184 and 192 spots. The 290,000 s.f. building will be concrete, "clad with masonry, decorative metals and soaring full height windows," according to WCS.

2 M Street is estimated to be taking $82 million of the total $700 million needed for NW1, which includes in all: 1,600 units of mixed-income housing, 40,000 s.f. of retail, and 220,000 s.f. of commercial office space.

NW1 is one of five projects being realized by the New Communities Initiative, a public-private partnership that aims to develop areas that exhibit "high rates of poverty and unemployment, as well as blight and deterioration of the housing stock." The other four projects are Barry Farm (Ward 8), Lincoln Heights (Ward 7), Richardson Dwellings (Ward 7), and Park Morton (Ward 1). 

Your Next Place

0 comments

By Franklin Schneider

This house bills itself as "one of the most unique homes in DC," and I'm inclined to agree. If I lived in this house, I'd carry around a little picture of it in my wallet and "accidentally" drop it whenever an attractive woman was around. (“What, that old thing? Oh, that's just my house.”)

The exterior is striking right off the bat – sort of an angular vertical chessboard look – and the inside is equally impressive. Lots of sleek, jet-black woodwork, which to my eye looked radically fresh and new, like the outfits of those Japanese hipsters who hang out in the East Village. Call me morbid, but there's not enough black in the interior design world. (Why is that? Is it a brightness thing? ) At any rate, black wood is a motif in this house. There's also an atrium-like living room with a massive window-slash-skylight set high up diagonally on the wall, and a great kitchen that's somehow at once massive but compact, a minor wonder of design and efficiency, like what I imagine Steve Jobs' kitchen looks like. (Only his woodwork is white, obviously.)



The master bedroom it truly palatial, as is the renovated master bath, which features a massive shower with a bench in it; I never understood what those were for until I lived with my ex girlfriend in a place that had a shower bench. When we were fighting, I'd wait until she was about to jump in the shower, zip in before her, and then doze on the shower bench while running the hot water. It did wonders for my skin, though not my relationship (I “won” though!)

Private parking, washer/dryer, and it's a short walk to Adams Morgan, Mt. Pleasant/Columbia Heights, and Meridian Hill Park, one of the most beautiful green spaces in Washington D.C and a great place to see drunk men sleeping under bushes.

2633 15TH ST N #4
Washington DC 20009
$779,500






Monday, August 15, 2011

Bainbridge Starting on 17-Story Bethesda Apartments

8 comments
If Bethesda Row has bloomed into the urban village experience, Woodmont Triangle may one day be its downtown. While no large projects have begun in the quadrant just north of Bethesda Row - though many have been planned - that is about to change in a big way. The Bainbridge Companies will begin construction this week on their 17-story, highly amenitized apartment building a few blocks north of the Bethesda Metro station. Once known as the Monty, the project will be rebranded as "Bainbridge Bethesda" by the Florida based developer.

One of the tallest projects in the area, the apartment building will feature a four-story underground parking garage and is meant to animate both the skyline and street level, the former with its height and periodically receding facade, and the latter with a new pedestrian boulevard that will feature retail and art, breaking up the block and endowing the building with a corner presence.
Some sources say the project could cost $80m to build. The selling feature, to developers, is the raised amenities, placed at the top to take advantage of views over Bethesda and Washington D.C. The building will feature a gym leading out to a 15th floor terrace and rooftop pool. "Obviously that's really expensive real estate that high that we're forgoing, but its the kind of thing that inspires people on a daily basis" says Josh Wooldridge, Senior Development Director with Bainbridge. "You just can't compare that to a gym in a basement."

The project is a long time coming, having been before the county planning board for 5 years. Bainbridge purchased the site with approvals last summer, and expected to break ground almost immediately, but equity issues have held up construction, which has been billed as nearly imminent since that time. Now Bainbridge has corralled equity partners, including Greek shipping company Restis Group and DC-based National Real Estate Advisors, along with the Department of Housing and Urban Development, to provide the needed capital, having closed on financing just two weeks ago today. Since the county adopted the Woodmont Sector Plan 6 years ago, no highrises have been built in the area (Lionsgate was planned previously).

Bainbridge will now start 3-4 weeks of demolition, followed by an estimated 18-20 months of construction. The building will take over mostly vacant retail space, replacing it with a 20-foot wide pedestrian passageway that links Fairmont and St. Elmo Streets, with retail fronting both streets. Wooldridge says design of the 7500 s.f. of retail will be finalized next year when the project is under construction.

Architects at SK&I have designed a LEED Silver project with green roof that will be notably taller than the low density architecture of Woodmont Triangle. "We'll be 5 stories taller than anything else around" says Wooldridge, although the 174-foot project will fall short of the Clark building at 200 feet. With demolition permits in hand, site work will commence immediately.

Bethesda, MD real estate development news

Sunday, August 14, 2011

Your Next Place

2 comments
By Franklin Schneider

Duplex condo! "The condo that feels like a house." Because let's be
honest, sometimes a regular apartment or condo can feel a bit too much like a little cement box surrounded by dozens of other little cement boxes. When my mom, who's lived in huge freestanding Midwestern
houses her whole life, visited me here and saw my apartment, she asked, “So when the person downstairs takes a number two, can you smell it in here?” “No, mother,” I said. She looked at me and then nodded slowly. Clearly, she didn't believe me.

But now this place – this place a mother could love. Two sleek levels in a beautiful building, a ton of natural light, gourmet kitchen with stainless steel appliances, granite countertops, and maple cabinets. A winding staircase takes you up to an airy loftlike space on the second floor, where the spacious family room flows into the generously-proportioned kitchen. Two bedrooms, two recently-renovated and very fine baths.


Washer/dryer on-site, so you can watch whatever you want while you do your laundry instead of being at the mercy of that remote-wielding attendant at the laundromat who wears an Andy Warhol-style toupee and has the most annoying habit of watching commercials and then flipping away when the actual program comes back. Why does he do that? I asked him once and he just said, “9/11.” True story!

Best of all, the place is in Logan Circle, so you're extremely close to whatever you might want to do (restaurants, nightlife) but far enough away that people won't be shrieking into their cellphones and vomiting Alabama Slammas under your window. Trust me, I lived right in the heart of Adams Morgan for a year and you have no idea how quickly the sound of laughter can become an object of pure hatred.

1437 Rhode Island Ave Nw #107
Washington, DC 20005
2 Bedrooms, 2 Baths
$524,900



Washington D.C. real estate news

Saturday, August 13, 2011

A Lobby for All Seasons

0 comments
Alexandria Virginia commercial real estate By Carlyle Towers Design, Camille Saum designer, Old Town AlexandriaBeth Herman

From 20 stories up at the top of the Carlyle Towers, 2151 Jamieson Avenue, the city of Alexandria spreads out in a mélange of shapes and colors. In autumn, the season’s golds, purples, reds and yellows are a palette of particular appeal. But not so for the same theme in the condominium’s current South Tower lobby.

For interior designer Camille Saum and associate designer Nicole Hansen, transforming what is essentially “a harlequin lobby” into an “elegant and durable space” brought the two on a trio of exploratory missions to the property, long before they were tapped for the job.Carlyle Towers Design, Camille Saum designer, Old Town Alexandria

“We wanted to have the answers,” said Hansen of the time they and nine other firms were first approached for ideas to renovate the south building. For them, the answers included using color continuity to turn a disjointed array of the building’s public spaces into true residential luxury, but with an eye to sustainability and cost-effective measures as well.

Built in phased construction in 1996, 1998 and 2000, the Carlyle’s three towers undergo a kind of roving renovation, according to Hansen, who explained work on the South Tower, built in ’98, is set to begin in the fall. On the redesign agenda are the approximately 1,500 s.f. lobby and mailroom, the Carlyle room which is used for special events that include parties, weekly yoga classes and bridge games, hallways for floors 13 through 20, a conference room and part of the facility’s kitchen.

“The colors that we found in the lobby are predominantly bright red, purple, and then rugs of a sort of rainbow hue in red, blue, yellow and purple,” Hansen said, adding the sofas are a kind of “retro purple mohair.” Two 2 ½-ft.-in-diameter two-story central columns that anchor the space are a red-and-purple harlequin pattern from floor to ceiling. There is no continuity of this particular color experience outside the lobby, so it does not agree with the rest of the property, Hansen explained.

In sharp contrast, the floors are a subdued cognac, bone and light brown marble –a dignified, neutral palette the designers are seeking to replicate in furniture, rug and fabric choices.

Look homewardCarlyle Towers Lobby Design, Camille Saum designer, Old Town Alexandria

According to Hansen, the lobby bifurcates into left and right living room-type spaces, which she and Saum call “the vignettes.” The area below the left and right space’s mirrored mullions is painted white and magenta, though will become a neutral tone with “punches of color.” Durable draperies will complement the two vignettes for a homey look, and Xorel fabric in a shiny beige-and-gold tone will be used on specific walls and columns as it is compatible with the marble flooring. Recycled porcelain flooring will also be added.

Opting for modern but transitional furniture in a warm space that honors the past though embraces the future, Karges and Caron sofas in soft hues are slated for the lobby, with Saum’s signature pop of color (Spring Dust by Benjamin Moore) on the tray ceiling.

In the Carlyle room, used for activities and adjacent to the pool area, neutral tones will be offset by chartreuse accents in 100 percent wool carpeting, for sustainability, and ceiling. “Right now it’s a kind of foil,” Hansen said of the ceiling, adding that a grid of 4-by-4-ft. beams traverses it. The foil is tarnished, so the ceiling will be painted a flat chartreuse color instead. The space’s soon-to-be custom carpeting in taupe and chartreuse will also be replicated in upstairs hallways. “We wanted it all to have a feeling of movement, but with a warm, residential feel as well,” Hansen said, because the building with its public spaces is very much people’s home as opposed to an office building.Carlyle Towers Design, Camille Saum designer, Old Town Alexandria commercial real estate

The Carlyle room’s expansive dance floor will be refinished in a taupe stain to blend with the carpeting. Prevailing sound issues during lively events will be mitigated by the use of Novawall, a sound absorption material that will be used on the ceiling and one wall, camouflaged by more Xorel fabric.

Where lighting is concerned, the designer said illuminating the lobby’s and hallways’ many dark spaces with an eye towards energy savings were paramount, as well as updating the current look. To that end, LED lights will be interspersed with sustainable recessed lighting, and for aesthetics four contemporary wood and iron chandeliers from Dominion Electric Supply will replace a group of nondescript chandeliers currently in use.

With the four-month project slated to begin in September, Hansen said they are looking forward to the challenge, their objective to make Carlyle Towers’ public spaces as warm, durable and welcoming as the residents’ own homes.

Alexandria Virginia commercial real estate design

Friday, August 12, 2011

Redevelopment of Former Italian Embassy Past the HPRB

4 comments
Potomac Construction is one step closer (but only one) to breaking ground on the redevelopment of the former Italian Embassy, due to project architect Trout Design Studio and Valor Development moving past the Historic Preservation Review Board for good.

At the end of July, the HPRB unanimously (5-0) approved the revised plans for the redevelopment. According to the Historic Preservation Office, "The Board found the design refinements and materials submitted to be consistent with the concept design and compatible with the character of the landmark."

Yet "the Board directed the applicants to restudy the entrances on Fuller Street and Mozart Place to see if changes to the design, size, and/or scale might improve their compatibility."

Next up is a visit to the Zoning Commission for consolidated PUD and map amendment approval, on September 8th.

Washington D.C. real estate development news

Thursday, August 11, 2011

Shaw Giant to Close September 8th to Make Way for CityMarket at O

20 comments
The Shaw Giant will close September 8th in order to make way for CityMarket at O, Roadside Development's $260 million dollar project that will rebuild 2 full blocks in Shaw with 87,000 square feet of retail (including the Giant), 629 residential units, and 500 parking spaces. The project had received demolition permits early this year and a HUD financing commitment in April, leaving just the final administrative hurdles to clear before beginning work on the long awaited project.

Under the terms of the agreement with Giant, Roadside Development was required to give Giant officials a 60-day notice to vacate, which it planned to do once the funding was secure and in place. While Roadside officials offered a "no comment" on the notice, Giant Store Manager Patrick Aryee tells DCMud that Giant corporate officials informed him yesterday that the store would close September 8th. Once Giant closes, Roadside has 2 years to complete the project to let Giant back in the space. Roadside Principal Armand Spikell told DCMud this spring that Roadside would likely issue the 60 day notice by July.

The closure is therefore sure to be followed quickly by frenetic construction and add vigor to revitalization in Shaw that has already gained steam with such projects as the Marriott Marquis, Progression Place, and a new pair of Marriotts. The new Giant Foods will be one of the larger nearby supermarkets at 55,000 s.f., with 13,000 s.f. underground, burying such items as the loading dock which now mars 9th street.




The buildings are being designed by Shalom Baranes Architects and built by Clark Construction.

Washington DC real estate development news

Heritage Foundation to Raze Church on Capitol Hill

5 comments

The Heritage Foundation has been given the green light to raze the former Unity Baptist Church at 426 3rd Street, NE near Union Station on Capitol Hill. The church, located directly behind The Heritage Foundation, was sold in 2004 for $1.3 million. According to a representative, The Foundation does intend to build on the site, however plans are nascent and not available for public disclosure at this time.

Though the church was constructed in 1919, additions were added in the 1960s and '70s which overtook the original façade; due to this, the Historic Preservation Review Board ruled unanimously to support the raze, as the building "no longer contributes to the Capitol Hill Historic District."

Washington D.C. real estate development news

Your Next Place

5 comments
By Franklin Schneider

Located in a fully-renovated Dupont mansion, this unit boasts fantastically eclectic spaces with elegant finishes. From the high ceilings and staggered planes of the spacious, bright living room (with white marble fireplace), to the hedged-in, vaguely Stonehenge-ish patio, this place had no end of little surprises. The master bedroom is truly palatial, with a luxurious master bath (loved the twin basins) and walk-in closets so big you could plausibly rent them out as separate apartments.

But if I had to pick a highlight, it would be the streamlined custom-designed gourmet kitchen, with Miele & Bosch appliances and teardrop-shaped light fixtures suspended over the largest island I've ever seen, a fifteen foot long slab of marble that makes most kitchen islands look like a postage stamp. Don't ever underestimate the importance of a kitchen; in most houses, it's where the real interaction occurs. You know what I mean; at parties, the living room is all small talk, but the real talk is in the kitchen. Maybe it's the proximity to food, it triggers some sort of visceral instinct. In my life, almost all the major “life-changing conversations” I've had have taken place in the kitchen, from the one that ended with my girlfriend at the time throwing a platter of steaming hot chinese food in my face, to the one that ended when yet another girlfriend kicked her wooden clog off her foot, across the room, and into my groin.


The entire unit is wired for sound, and there's an iPod dock so everyone else in the house can snicker and roll their eyes at your musical tastes. It's in Dupont, so you're close to and roughly equidistant from Logan, Adams Morgan, U Street, and anywhere else you might want to go. Plus, you get to park in a huge circular driveway out front, just like Tony Montana. And look how well things turned out for him!

1841 16th Street, NW #1
Washington D.C. 20009

3 Bedrooms, 2.5 Baths
$1,299,000






Washington, D.C. real estate news

 

DCmud - The Urban Real Estate Digest of Washington DC Copyright © 2008 Black Brown Pop Template by Ipiet's Blogger Template